Substation Scout

Ch-Valley Solar

PJM queue ID AF1-137 Terminal status

Queue IDAF1-137
Project nameCh-Valley Solar
Status (as published)Withdrawn
SubstationNewlinville
Point of interconnectionNewlinville 34.5 kV
CountyChester
StatePA
Voltage34.5 kV
Capacity5.9 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2023-04-10
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy9.8
Mw Capacity5.9
Mfo9.8
Withdrawn Date4/27/2024

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.