Substation Scout

Fayetteville 12.47 kV

PJM queue ID AF1-061 Terminal status

Queue IDAF1-061
Project nameFayetteville 12.47 kV
Status (as published)Withdrawn
SubstationFayetteville
Point of interconnectionFayetteville 12.47 kV
CountyFranklin
StatePA
Voltage12.5 kV
Capacity1.2 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2021-12-10
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy4
Mw Capacity1.2
Mfo4
Withdrawn Date8/6/2020

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.