Substation Scout

Crockett Solar Project

PJM queue ID AF1-015 Terminal status

Queue IDAF1-015
Project nameCrockett Solar Project
Status (as published)Withdrawn
SubstationEaston-Steele II
Point of interconnectionEaston-Steele 138 kV II
CountyTalbot
StateMD
Voltage138 kV
Capacity6.3 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2026-03-31
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy15
Mw Capacity6.3
Mfo59
Withdrawn Date6/25/2025

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.