Substation Scout

Rocky Road

PJM queue ID AE2-312 Terminal status

Queue IDAE2-312
Project nameRocky Road
Status (as published)Withdrawn
SubstationRocky Road
Point of interconnectionRocky Road
CountyKane
StateIL
VoltageNot reported
Capacity7 MW
Resource (as published)Natural Gas
Resource categoryGas (normalised for filtering)
Target commercial operation2019-06-01
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy7
Mw Capacity7
Mfo411.7
Withdrawn Date4/4/2019

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.