Shockoe Solar Farm
PJM queue ID AE2-187 Terminal status
| Queue ID | AE2-187 |
|---|---|
| Project name | Shockoe Solar Farm |
| Status (as published) | Withdrawn |
| Substation | Shockoe DP-Chatham |
| Point of interconnection | Shockoe DP-Chatham 69 kV |
| County | Pittsylvania |
| State | VA |
| Voltage | 69 kV |
| Capacity | 36 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalised for filtering) |
| Target commercial operation | 2020-09-01 |
| Source dataset | cycle |
Additional filed fields
| Developer | Zenith Solar, LLC |
|---|---|
| Transmission Owner | Dominion |
| Project Type | Generation Interconnection |
| Cycle | TC1 |
| Stage | PHASE 3 |
| Mw Energy | 60.0 |
| Mw Capacity | 36.0 |
| Mfo | 60.0 |
| Submitted Date | 3/18/2019 |
| Withdrawn Date | 11/3/2025 |
| Withdrawn Remarks | Customer Milestone Not Met |
| Last Updated | 11/3/2025 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.