Substation Scout

Southampton 13.2 kV

PJM queue ID AE2-085 Terminal status

Queue IDAE2-085
Project nameSouthampton 13.2 kV
Status (as published)Withdrawn
SubstationSouthampton
Point of interconnectionSouthampton 13.2 kV
CountyBurlington
StateNJ
Voltage13.2 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Solar; Storage
Resource categoryHybrid (normalised for filtering)
Target commercial operation2020-03-02
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy5.04
Mw Capacity0
Mfo5.04
Withdrawn Date8/14/2019

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.