Casino Drive Solar

PJM queue ID AE2-081 Terminal status

Queue IDAE2-081
Project nameCasino Drive Solar
Status (as published)Withdrawn
SubstationHowell Solar II
Point of interconnectionHowell 12.47 kV Solar II
CountyMonmouth
StateNJ
Voltage12.5 kV
Capacity1.6 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2022-05-01
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy3.2
Mw Capacity1.57
Mfo3.2
Withdrawn Date8/8/2022

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.