Substation Scout

Hughesville 69 kV

PJM queue ID AE1-231 Terminal status

Queue IDAE1-231
Project nameHughesville 69 kV
Status (as published)Withdrawn
SubstationHughesville
Point of interconnectionHughesville 69 kV
CountyCharles
StateMD
Voltage69 kV
Capacity9.4 MW
Resource (as published)Storage; Solar
Resource categoryHybrid (normalised for filtering)
Target commercial operation2020-07-31
Source datasetserial

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy20
Mw Capacity9.4
Mfo20
Withdrawn Date9/3/2021

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.