Substation Scout

Allentown Booster 138 kV

PJM queue ID AE1-223 Terminal status

Queue IDAE1-223
Project nameAllentown Booster 138 kV
Status (as published)Withdrawn
SubstationAllentown Booster
Point of interconnectionAllentown Booster 138 kV
CountyBurlington
StateNJ
Voltage138 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2018-11-16
Source datasetserial

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy1.86
Mw Capacity0
Mfo1.86
Withdrawn Date6/3/2019

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.