Substation Scout

Glassboro RE Solar

PJM queue ID AE1-219 Terminal status

Queue IDAE1-219
Project nameGlassboro RE Solar
Status (as published)Withdrawn
SubstationGlassboro II
Point of interconnectionGlassboro 12 kV II
CountyGloucester
StateNJ
Voltage12 kV
Capacity1.8 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2022-07-17
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy4.4
Mw Capacity1.8
Mfo4.4
Withdrawn Date8/17/2020

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.