Wingstem Solar Energy Farm
PJM queue ID AE1-170 Terminal status
| Queue ID | AE1-170 |
|---|---|
| Project name | Wingstem Solar Energy Farm |
| Status (as published) | Withdrawn |
| Substation | Kenzie Creek-Colby |
| Point of interconnection | Kenzie Creek-Colby 138 kV |
| County | Cass |
| State | MI |
| Voltage | 138 kV |
| Capacity | 63 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalised for filtering) |
| Target commercial operation | 2025-12-31 |
| Source dataset | serial |
Tracked changes
1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-09-07 | Terminal status | 63 | Suspended → Withdrawn |
Additional filed fields
| Project Type | Generation Interconnection |
|---|---|
| Mw Energy | 150 |
| Mw Capacity | 63 |
| Mfo | 150 |
| Withdrawn Date | 9/1/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.