CC Solar I

PJM queue ID AE1-157 Terminal status

Queue IDAE1-157
Project nameCC Solar I
Status (as published)Pending Termination
SubstationLadysmith CT-St. Johns
Point of interconnectionLadysmith CT-St. Johns 230 kV
CountyCaroline
StateVA
Voltage230 kV
Capacity77.8 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2028-06-27
Source datasetserial

Tracked changes

1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-09-21 Terminal status 77.8 Engineering and Procurement → Pending Termination

Full change log →

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy120
Mw Capacity77.8
Mfo120

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.