Maroon Solar

PJM queue ID AE1-153 Terminal status

Queue IDAE1-153
Project nameMaroon Solar
Status (as published)Pending Termination
SubstationRemington-Gordonsville
Point of interconnectionRemington-Gordonsville 230 kV
CountyCulpeper
StateVA
Voltage230 kV
Capacity89.4 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2027-05-30
Source datasetserial

Tracked changes

1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-09-23 Terminal status 89.4 Engineering and Procurement → Pending Termination

Full change log →

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy149
Mw Capacity89.4
Mfo149

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.