Substation Scout

Meads Store 138 kV

PJM queue ID AE1-130 Terminal status

Queue IDAE1-130
Project nameMeads Store 138 kV
Status (as published)Withdrawn
SubstationMeads Store
Point of interconnectionMeads Store 138 kV
CountyBedford
StateVA
Voltage138 kV
Capacity55.3 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2020-11-30
Source datasetserial

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy83
Mw Capacity55.3
Mfo83
Withdrawn Date8/6/2021

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.