Substation Scout

Brandonville Solar

PJM queue ID AE1-106 Terminal status

Queue IDAE1-106
Project nameBrandonville Solar
Status (as published)Withdrawn
SubstationLake Lynn-Hazelton
Point of interconnectionLake Lynn-Hazelton 138 kV
CountyPreston
StateWV
Voltage138 kV
Capacity59 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2026-12-31
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy99.6
Mw Capacity59
Mfo99.6
Withdrawn Date4/9/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.