Substation Scout

Hickory Solar

PJM queue ID AE1-028 Terminal status

Queue IDAE1-028
Project nameHickory Solar
Status (as published)Withdrawn
SubstationHickory
Point of interconnectionHickory 34.5 kV
CountyCity of Chesapeake
StateVA
Voltage34.5 kV
Capacity7.6 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2020-12-31
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy12
Mw Capacity7.6
Mfo12
Withdrawn Date1/14/2020

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.