Substation Scout

Cherryville 12.5 kV

PJM queue ID AD2-209 Terminal status

Queue IDAD2-209
Project nameCherryville 12.5 kV
Status (as published)Withdrawn
SubstationCherryville
Point of interconnectionCherryville 12.5 kV
CountyHunterdon
StateNJ
Voltage12.5 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Storage
Resource categoryBattery (normalised for filtering)
Target commercial operation2018-11-30
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy2
Mw Capacity0
Mfo2
Withdrawn Date10/9/2018

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.