Beaver Creek Solar

PJM queue ID AD2-062 Terminal status

Queue IDAD2-062
Project nameBeaver Creek Solar
Status (as published)Withdrawn
SubstationRoxbury-Greene
Point of interconnectionRoxbury-Greene 138 kV
CountyFranklin
StatePA
Voltage138 kV
Capacity53.5 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2024-12-03
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy80.3
Mw Capacity53.5
Mfo80.3
Withdrawn Date1/27/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.