Substation Scout

Laurel Lake Solar

PJM queue ID AD2-052 Terminal status

Queue IDAD2-052
Project nameLaurel Lake Solar
Status (as published)Withdrawn
SubstationLaurel Lake Solar
Point of interconnectionLaurel Lake Solar
CountySalem
StateNJ
VoltageNot reported
Capacity6.7 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2019-06-30
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy10
Mw Capacity6.7
Mfo10
Withdrawn Date5/1/2019

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.