Substation Scout

Oliver Solar

PJM queue ID AD1-038 Terminal status

Queue IDAD1-038
Project nameOliver Solar
Status (as published)Withdrawn
SubstationOliver Solar
Point of interconnectionOliver Solar
CountyBurlington
StateNJ
VoltageNot reported
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2019-10-31
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy0.3
Mw Capacity0
Mfo0.3
Withdrawn Date8/25/2017

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.