Substation Scout

Ontario 23 kV

PJM queue ID AD1-019 Terminal status

Queue IDAD1-019
Project nameOntario 23 kV
Status (as published)Withdrawn
SubstationOntario
Point of interconnectionOntario 23 kV
CountyAtlantic
StateNJ
Voltage23 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Natural Gas
Resource categoryGas (normalised for filtering)
Target commercial operation2019-06-03
Source datasetserial

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy7.6
Mw Capacity0
Mfo13.1
Withdrawn Date3/8/2022

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.