Centerville Pike Solar

PJM queue ID AC2-196 Terminal status

Queue IDAC2-196
Project nameCenterville Pike Solar
Status (as published)Withdrawn
SubstationFentress
Point of interconnectionFentress 34.5kV
CountyCity of Chesapeake
StateVA
Voltage34.5 kV
Capacity10 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2021-12-15
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy16.7
Mw Capacity10
Mfo16.66
Withdrawn Date2/8/2021

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.