Substation Scout

Double Tollgate Solar Project

PJM queue ID AC2-174 Terminal status

Queue IDAC2-174
Project nameDouble Tollgate Solar Project
Status (as published)Withdrawn
SubstationDouble Tollgate
Point of interconnectionDouble Tollgate 34.5kV
CountyClarke
StateVA
Voltage34.5 kV
Capacity3.8 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2023-03-31
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy10
Mw Capacity3.8
Mfo10
Withdrawn Date2/28/2024

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.