Substation Scout

The Home Depot Store #0951

PJM queue ID AC1-202 Terminal status

Queue IDAC1-202
Project nameThe Home Depot Store #0951
Status (as published)Withdrawn
SubstationCedar
Point of interconnectionCedar 12kV
CountyOcean
StateNJ
Voltage12 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Natural Gas
Resource categoryGas (normalised for filtering)
Target commercial operation2018-12-31
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy0.21
Mw Capacity0
Mfo0.21
Withdrawn Date11/12/2018

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.