Substation Scout

Timber Switch 138kV

PJM queue ID AC1-176 Terminal status

Queue IDAC1-176
Project nameTimber Switch 138kV
Status (as published)Withdrawn
SubstationTimber Switch
Point of interconnectionTimber Switch 138kV
CountyPaulding
StateOH
Voltage138 kV
Capacity7.6 MW
Resource (as published)Wind
Resource categoryWind (normalised for filtering)
Target commercial operation2019-10-31
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy58.7
Mw Capacity7.6
Mfo58.7
Withdrawn Date7/9/2020

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.