Hickory Wind

PJM queue ID AC1-168 Terminal status

Queue IDAC1-168
Project nameHickory Wind
Status (as published)Pending Termination
SubstationKewanee-Streator
Point of interconnectionKewanee-Streator
CountyPutnam
StateIL
VoltageNot reported
Capacity10.2 MW
Resource (as published)Wind
Resource categoryWind (normalised for filtering)
Target commercial operation2025-10-31
Source datasetserial

Tracked changes

1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-10-05 Terminal status 10.2 Suspended → Pending Termination

Full change log →

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy78.65
Mw Capacity10.2
Mfo78.65

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.