TWE Chesapeake Solar

PJM queue ID AC1-047 Terminal status

Queue IDAC1-047
Project nameTWE Chesapeake Solar
Status (as published)Withdrawn
SubstationHickory
Point of interconnectionHickory 34.5kV
CountyCity of Chesapeake
StateVA
Voltage34.5 kV
Capacity12.9 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2018-11-15
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy20
Mw Capacity12.9
Mfo20
Withdrawn Date10/20/2017

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.