Substation Scout

Centerville Pike Solar

PJM queue ID AC1-046 Terminal status

Queue IDAC1-046
Project nameCenterville Pike Solar
Status (as published)Withdrawn
SubstationFentress
Point of interconnectionFentress 34.5kV
CountyCity of Chesapeake
StateVA
Voltage34.5 kV
Capacity9.7 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2018-11-15
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy15
Mw Capacity9.7
Mfo15
Withdrawn Date10/20/2017

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.