Substation Scout

Potomac Solar, LLC

PJM queue ID AB2-129 Terminal status

Queue IDAB2-129
Project namePotomac Solar, LLC
Status (as published)Withdrawn
SubstationDoubs
Point of interconnectionDoubs 230kV
CountyFrederick
StateMD
Voltage230 kV
Capacity30.4 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2020-04-30
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy80
Mw Capacity30.4
Mfo80
Withdrawn Date7/30/2021

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.