Stone Branch Solar

PJM queue ID AB2-085 Terminal status

Queue IDAB2-085
Project nameStone Branch Solar
Status (as published)Withdrawn
SubstationAdams
Point of interconnectionAdams 138kV
CountyAdams
StateOH
Voltage138 kV
Capacity33.9 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2023-12-31
Source datasetserial

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy49.9
Mw Capacity33.93
Mfo49.9
Withdrawn Date3/26/2025