Substation Scout

Stone Branch Solar

PJM queue ID AB2-085 Terminal status

Queue IDAB2-085
Project nameStone Branch Solar
Status (as published)Withdrawn
SubstationAdams
Point of interconnectionAdams 138kV
CountyAdams
StateOH
Voltage138 kV
Capacity33.9 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2023-12-31
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy49.9
Mw Capacity33.93
Mfo49.9
Withdrawn Date3/26/2025

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.