Substation Scout

Costen Solar Energy Center

PJM queue ID AB2-084 Terminal status

Queue IDAB2-084
Project nameCosten Solar Energy Center
Status (as published)Withdrawn
SubstationCosten
Point of interconnectionCosten 25kV
CountySomerset
StateMD
Voltage25 kV
Capacity3.8 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2019-10-20
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy10
Mw Capacity3.8
Mfo10
Withdrawn Date2/1/2019

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.