Substation Scout

Mason Dixon Solar Center Facility

PJM queue ID AB1-123 Terminal status

Queue IDAB1-123
Project nameMason Dixon Solar Center Facility
Status (as published)Withdrawn
SubstationShowalter
Point of interconnectionShowalter 34.5kV
CountyWashington
StateMD
Voltage34.5 kV
Capacity7 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2018-09-30
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy18.4
Mw Capacity7
Mfo18.4
Withdrawn Date5/4/2021

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.