Substation Scout

Trenton 13kV

PJM queue ID AB1-118 Terminal status

Queue IDAB1-118
Project nameTrenton 13kV
Status (as published)Withdrawn
SubstationTrenton
Point of interconnectionTrenton 13kV
CountyMercer
StateNJ
Voltage13 kV
Capacity0.7 MW
Resource (as published)Natural Gas
Resource categoryGas (normalised for filtering)
Target commercial operation2016-01-31
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy0.735
Mw Capacity0.735
Mfo0.735
Withdrawn Date11/2/2015

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.