Rio Grande 12kV

PJM queue ID AB1-094 Terminal status

Queue IDAB1-094
Project nameRio Grande 12kV
Status (as published)Withdrawn
SubstationRio Grande
Point of interconnectionRio Grande 12kV
CountyCape May
StateNJ
Voltage12 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Natural Gas
Resource categoryGas (normalised for filtering)
Target commercial operation2015-12-01
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy0.85
Mw Capacity0
Mfo0.85
Withdrawn Date10/12/2015

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.