Substation Scout

Byron to Wayne Thermal #1 Project

PJM queue ID AB1-089 Terminal status

Queue IDAB1-089
Project nameByron to Wayne Thermal #1 Project
Status (as published)Withdrawn
SubstationByron-Wayne #1
Point of interconnectionByron-Wayne 345kV #1
CountyLee
StateIL
Voltage345 kV
Capacity550 MW
Resource (as published)Natural Gas
Resource categoryGas (normalised for filtering)
Target commercial operation2026-06-01
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy575
Mw Capacity550
Mfo575
Withdrawn Date6/9/2025

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.