Texas 240v
PJM queue ID AB1-048 Terminal status
| Queue ID | AB1-048 |
|---|---|
| Project name | Texas 240v |
| Status (as published) | Withdrawn |
| Substation | Texas 240v |
| Point of interconnection | Texas 240v |
| County | Baltimore County |
| State | MD |
| Voltage | Not reported |
| Capacity | 0 MW (0 MW as filed — net change or energy-only) |
| Resource (as published) | Storage |
| Resource category | Battery (normalised for filtering) |
| Target commercial operation | 2015-12-31 |
| Source dataset | serial |
Additional filed fields
| Project Type | Generation Interconnection |
|---|---|
| Mw Energy | 0.005 |
| Mw Capacity | 0 |
| Mfo | 0.005 |
| Withdrawn Date | 9/27/2019 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.