Substation Scout

Chesapeake Solar

PJM queue ID AA2-180 Terminal status

Queue IDAA2-180
Project nameChesapeake Solar
Status (as published)Withdrawn
SubstationHickory
Point of interconnectionHickory 34.5kV
CountyCity of Chesapeake
StateVA
Voltage34.5 kV
Capacity14 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2016-12-31
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy20
Mw Capacity14
Mfo20
Withdrawn Date9/29/2016

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.