Substation Scout

Five Forks Solar

PJM queue ID AA2-169 Terminal status

Queue IDAA2-169
Project nameFive Forks Solar
Status (as published)Withdrawn
SubstationFive Forks
Point of interconnectionFive Forks 115kV
CountyWarren
StateNC
Voltage115 kV
Capacity13.7 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2018-08-31
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy20
Mw Capacity13.7
Mfo20
Withdrawn Date4/3/2018

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.