Route 632 Washington Solar Facility

PJM queue ID AA2-159 Terminal status

Queue IDAA2-159
Project nameRoute 632 Washington Solar Facility
Status (as published)Withdrawn
SubstationDownsville
Point of interconnectionDownsville 34.5kV
CountyWashington
StateMD
Voltage34.5 kV
Capacity8.7 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2017-09-15
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy16
Mw Capacity8.7
Mfo16
Withdrawn Date7/21/2020