Substation Scout

Trappe 12kV

PJM queue ID AA2-150 Terminal status

Queue IDAA2-150
Project nameTrappe 12kV
Status (as published)Withdrawn
SubstationTrappe
Point of interconnectionTrappe 12kV
CountyTalbot
StateMD
Voltage12 kV
Capacity6.8 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2016-09-15
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy10
Mw Capacity6.8
Mfo10
Withdrawn Date4/29/2016

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.