Furnace Brook-Hazen Switch Point 34kV

PJM queue ID AA2-114 Terminal status

Queue IDAA2-114
Project nameFurnace Brook-Hazen Switch Point 34kV
Status (as published)Withdrawn
SubstationFurnace Brook-Hazen Switch Point
Point of interconnectionFurnace Brook-Hazen Switch Point 34kV
CountyUnion
StateNJ
Voltage34 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Storage
Resource categoryBattery (normalised for filtering)
Target commercial operation2016-04-01
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy20
Mw Capacity0
Mfo20
Withdrawn Date5/2/2016

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.