Collins

PJM queue ID AA2-035 Terminal status

Queue IDAA2-035
Project nameCollins
Status (as published)Withdrawn
SubstationCollins
Point of interconnectionCollins
CountyGrundy
StateIL
VoltageNot reported
Capacity1,019.3 MW
Resource (as published)Natural Gas
Resource categoryGas (normalised for filtering)
Target commercial operation2019-06-30
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy1019.3
Mw Capacity1019.3
Mfo1098.3
Withdrawn Date10/15/2018

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.