Substation Scout

NV Energy request Company IE

NV Energy queue ID Company IE

Queue request Company IE was listed in the NV Energy interconnection queue at the end of 2025 as a 70 MW project in Lander County, NV, according to Berkeley Lab’s queue data file. Its status as of December 31, 2025 was “Operational”, with a proposed online date of June 1, 2020.

Queue IDCompany IE
Project nameNot reported
Status (as published)Operational
SubstationNot reported
Point of interconnectionNot reported
CountyLander
StateNV
VoltageNot reported
Capacity70 MW
Resource (as published)Geothermal
Resource categoryOther (normalized for filtering)
Proposed online date2020-06-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Lander, NV: 41 requests in the NV Energy queue, 20 active totaling 3,807 MW.

Tracked changes

Not tracked. NV Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityNV Energy
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Queue date2018-03-19

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first