NV Energy request 25-00431
NV Energy queue ID 25-00431
Queue request 25-00431 was listed in the NV Energy interconnection queue at the end of 2025 as a 250 MW battery project in Storey County, NV, according to Berkeley Lab’s queue data file. Its status as of December 31, 2025 was “Active”, with a proposed online date of August 1, 2029.
| Queue ID | 25-00431 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Not reported |
| Point of interconnection | Not reported |
| County | Storey |
| State | NV |
| Voltage | Not reported |
| Capacity | 250 MW |
| Resource (as published) | Battery |
| Resource category | Battery (normalized for filtering) |
| Proposed online date | 2029-08-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Storey, NV: 15 requests in the NV Energy queue, 9 active totaling 3,410 MW.
Tracked changes
Not tracked. NV Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | NV Energy |
|---|---|
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | In Progress (unknown study) |
| Queue date | 2025-07-30 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.