NV Energy request 25-00400

NV Energy queue ID 25-00400

Queue request 25-00400 was listed in the NV Energy interconnection queue at the end of 2025 as a 50 MW battery project in Clark County, NV, according to Berkeley Lab’s queue data file. Its status as of December 31, 2025 was “Active”, with a proposed online date of October 31, 2025.

Queue ID25-00400
Project nameNot reported
Status (as published)Active
SubstationNot reported
Point of interconnectionNot reported
CountyClark
StateNV
VoltageNot reported
Capacity50 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2025-10-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Clark, NV: 173 requests in the NV Energy queue, 79 active totaling 18,326.3 MW.

Tracked changes

Not tracked. NV Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityNV Energy
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Queue date2025-07-30

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.