Substation Scout

YANKEE substation interconnection queue

2 active projects totaling 372.4 MW in the MISO queue.

2 MISO queue filings name YANKEE as the point of interconnection, all in MN.

2active projects
372.4active MW
2total filed
Queue IDProjectkVMWResourceStatus
J3961 Not reported n/r 245 Solar Active
J4057 Not reported n/r 127.4 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first