WEST MEMPHIS EHV - KEO EHV substation interconnection queue
6 active projects totaling 2,067.5 MW in the MISO queue, plus 2 with terminal status (shown grayed).
8 MISO queue filings name WEST MEMPHIS EHV - KEO EHV as the point of interconnection, all in AR.
6active projects
2,067.5active MW
8total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J2477 | Not reported | 500 | 600 | Solar | Active |
| J3303 | Not reported | 500 | 400 | Solar | Withdrawn |
| S1125 | Not reported | 500 | 400 | Hybrid | Active |
| J3597 | Not reported | 500 | 348 | Wind | Active |
| J3982 | Not reported | 500 | 319.5 | Wind | Active |
| J2482 | Not reported | 500 | 300 | Solar | Active |
| J2649 | Not reported | 500 | 250 | Hybrid | Withdrawn |
| J1820 | Not reported | 500 | 100 | Solar | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.