Substation Scout

Wellsburg Substation substation interconnection queue

2 active projects totaling 228.6 MW in the MISO queue.

2 MISO queue filings name Wellsburg Substation as the point of interconnection, all in Grundy County, IA.

2active projects
228.6active MW
2total filed
Queue IDProjectkVMWResourceStatus
H021 Not reported 115 138.6 Wind Operational
J041 Not reported 161 90 Wind Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first