MISO request J041

MISO queue ID J041

Queue request J041 was listed in the MISO interconnection queue at the end of 2025 as a 90 MW wind project in Grundy County, IA, according to Berkeley Lab’s queue data file. The filing names Wellsburg Substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of September 1, 2019.

Queue IDJ041
Project nameNot reported
Status (as published)Operational
SubstationWellsburg Substation
Point of interconnectionWellsburg 161 kV Substation
CountyGrundy
StateIA
Voltage161 kV
Capacity90 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2019-09-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Wellsburg Substation substation: 2 requests in the MISO queue, 2 active totaling 228.6 MW.

Queue IDProjectMWResourceStatus
H021Not reported138.6WindOperational

Grundy, IA: 2 requests in the MISO queue, 2 active totaling 228.6 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterDPP-2015-AUG West
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)DPP - SIS
Queue date2009-04-16
Operational date2019-09-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.