2 active projects totaling 150 MW in the MISO queue.

2 MISO queue filings name Walnut substation as the point of interconnection, all in Dane County, WI.

2active projects
150active MW
2total filed
Queue IDProjectkVMWResourceStatus
G096 Not reported 69 105 Gas Operational
G160 Not reported 69 45 Gas Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.